Profile Overview
This project involved the design, approval and installation of a new rooftop mobile access gantry to Road 6 at Slade Green Depot. The battery operated system can transvers the full length of stabled train on specially designed guiderails supported from the primary structure of the building, the gantry was installed to allow rooftop inspection and removal of rooftop AC units.