Project Overview

The Trevor Patrick Partnership was commissioned by Southern to provide ‘one stop shop’ construction consultancy services for the provision of projects to provide access for all at Goring – on – Sea and Durrington – on – Sea.

The projects formed part of Southern’s ongoing commitment to improve accessibility at their Stations.

The DDA/Accessibility project works included the following:

Goring – on – Sea

  • Breakout existing steps and construct new 1:20 ramp in accordance with DfT (SRA) guidelines.

Durrington – on – Sea

  • Breakout existing ramp surface and remodel ramp in accordance with DfT (SRA) guidelines.
  • Remove existing sections of palisade and demolish section of concrete platform to accommodate new access ramp.
  • Form new access ramp (length approx 33m) to back of platform.

Landscaping

The Project work activities involved the following:

  • Establishing general landscape requirements with clients
  • Conducting preliminary studies of the site (including levels, soil, ecology, buildings, services, and roads)
  • Assessing a site’s potential to meet the client’s specifications
  • Carrying out environmental impact assessments
  • Seeking and taking into account the views of local residents, potential users, and parties with a vested interest in the project
  • Accurately preparing and presenting detailed plans and working drawings, in- cluding applications, construction details and specifications for the project
  • Presenting proposals to clients, dealing with enquiries and negotiating any amendments to final design
  • Specifying and detailing of lighting layouts
    • Contacting and coordinating manufacturers and suppliers
    • Monitoring and checking work on-site
    • Specifying and detailing of fences, walls, paving kerbstones, tactile paving etc.